Snagging companies in Dubai
Property inspection companies that check a new home before you take the keys: what they inspect, how the report looks, whether a re-inspection is included, the areas they cover and the licence we checked.
Snagging companies in Dubai inspect new apartments, villas and townhouses for defects before the handover, and write a snag report with photos that you send to the developer. Companies also offer re-inspection after the developer fixes the snags, a check before the first year after handover ends, pre-purchase inspections of resale homes and move-in or move-out inspections for tenancies.
On this page: property inspection companies with what each one checks, its report and turnaround, re-inspection terms and prices as the company states them, the areas covered and the licence our editors checked. Below the list: what a snag list is, the types of inspection, the developer's defect liability under Dubai law and how snagging fits into the handover.
Where are you now?
Developer says it is ready
Book handover snagging now. Before you sign the handover. Send the snag list to the developer and ask for a fix date in writing.
I got the keys already
Inspect before month 12. The developer repairs defective installations for one year from your handover. Book an inspection before it ends.
Buying a resale home
Book a pre-purchase inspection. Use the report to agree repairs or the price before you sign.
Renting out or moving out
Book a move-in or move-out check. A dated record of the home's condition helps when the deposit is returned.
No company matches these filters.
Showing 1-10 of 10 companies
Compare snagging companies
What each company states about its inspection, report and prices. Ask for a sample report before you book.
Prices as each company states them on its own page; the date it last changed them is on the page. Ask for the same in a written quote.
What snagging is, and what a snag list is
A snag is a defect or an unfinished detail in a new home: a cracked tile, a door that does not close, a socket with no power, a leak under the sink, a scratch on a window frame. Snagging is the inspection that finds them, and the snag list (or snag report) is the written list of every defect with its location and a photo.
In Dubai a snagging company inspects a new apartment, villa or townhouse when the developer says it is ready, before you sign the handover. The developer then fixes the snags, and a re-inspection checks the snag work was done. The same inspection is used for a home you are buying from another owner or before a tenant moves in or out.
Nine groups on a typical snag list
- Walls, ceilings and paint
- Floors, tiles and skirting
- Doors, windows and locks
- Electrical points, lights and the panel
- Plumbing, water pressure and drainage
- Air conditioning and ventilation
- Kitchen units and appliances
- Bathrooms, sealant and waterproofing
- Balcony, facade and outdoor areas
Which property inspection do you need?
Snagging companies in Dubai offer several kinds of inspection. They differ in timing and in who uses the report.
| Inspection | When | What the report is for |
|---|---|---|
| Handover snagging | After the developer's notice that the home is ready, before you sign the handover | A list of defects for the developer to fix before you take the keys |
| Re-inspection | After the developer reports the snags fixed | Checking each snag on the first list, item by item |
| Inspection before the first year ends | Before 12 months from the handover of your unit | Defects in installations that appeared after you moved in, while the developer's one-year liability runs |
| Pre-purchase inspection | Before you sign for a resale home | Repairs to price into your offer or to ask the seller to make |
| Move-in or move-out inspection | At the start and end of a tenancy | A record of the home's condition for the deposit |
Developer defect liability in Dubai
Dubai Law No. 6 of 2019 on jointly owned property sets two different periods during which the developer must fix defects. They run from different dates, and many guides mix them up.
Any agreement made after the law came into force that contradicts these rules is void, and the law keeps any other rights owners have against developers under other legislation.
What if the developer does not fix it?- 011 year for installations, from your handover
Mechanical and electrical works, sanitary and sewerage installations: the developer repairs or replaces defective installations for one year from the date the unit is handed over to you. That is why a second inspection before month 12 is worth it.
- 0210 years for the structure, from the completion certificate
Defects in the main structure and its parts: ten years from the date the project obtained its completion certificate, not from the day you got the keys.
- 035% of the escrow held back
Under the Escrow Law, 5% of the escrow account is kept once the developer gets the completion certificate and released one year after the units are registered in buyers' names. The Dubai Land Department's FAQ describes it as a guarantee that defects found at completion or within a year after handover are fixed.
- 04A unit unfit for use
If at handover the unit is unfit for use because of material constructional defects, the buyer may apply to the competent court to end the contract with the developer.
- 05A smaller unit than agreed
If the net area is smaller than in the sale contract by more than 5%, the developer must compensate the buyer.
Where snagging fits into the handover
The usual order for an off-plan home in Dubai. Your developer's handover pack sets the exact dates.
- 1Completion
The project gets its completion certificate. Fully paid units then move from the interim register (Oqood) to the Real Estate Registry, and the developer may not refuse to hand over or register a unit whose buyer has met the contract.
- 2Inspection
Book the snagging company for the day the developer lets you in. Bring the floor plan and the specification from your sale contract.
- 3Snag list to the developer
Send the report with photos and ask for a written date by which the snags will be fixed.
- 4Re-inspection
The inspector checks every item on the first list. Sign the handover when the list is closed or the rest is agreed in writing.
- 5Title deed
The title deed is issued through the Oqood portal: AED 250 for the title deed, AED 250 for the map, AED 10 knowledge fee and AED 10 innovation fee, when the registration fee was already paid at the Oqood stage, as listed by the Dubai Land Department.
How to choose a snagging company in Dubai
Seven checks before you book a property inspection.
Compare companies- 1See a sample report
Ask for a real report with photos, room by room, and a clear location for every snag. The report is what you send to the developer.
- 2Check what the visit covers
Ask which of the nine groups are inspected, how long the visit takes for your size of home and which tools are used: moisture meter, thermal imaging, a drone for villas.
- 3Ask about re-inspection
Is a second visit included after the developer fixes the snags, and how much is a third?
- 4Agree the turnaround
The report should reach you in time to send it before the handover date. Ask for the number of hours or days in writing.
- 5Make sure the inspector is independent
The company should not work for your developer, its contractor or the broker who sold you the home.
- 6Ask for the trade licence
Check that inspection services are on the licence. On Emirae every listed company has its licence checked by an editor.
- 7Read reviews from owners
Reviews on Emirae come only from people with a confirmed email. Look at how the company answers complaints.
How much does snagging cost in Dubai?
There is no official price for snagging: each company sets its own, usually by the size and type of home. On Emirae, companies show their prices as they state them, with the date of the last update; when a price is not shown, ask for a written quote.
Compare the full cost for your home: the first visit, the re-inspection, thermal imaging if it is charged separately, and VAT.
Ask how the price is set: by the number of bedrooms or by area, and for villas separately.
Included once by some companies, charged per visit by others.
Thermal imaging, a drone for roofs and facades, or an inspection of a large villa garden can be charged on top.
- Is the re-inspection included?
- Is VAT included in the price?
- How many hours does the visit take?
- Can I join the inspection?
Snagging checklist: 36 checks room by room
A sample snag list to take to your handover, or to check a company's report against. Tick items as you go; for each snag, write the room, the exact spot and take a photo.
Bring the floor plan and the specification from your sale contract: check that the finishes and appliances match what you paid for.
Who works for whom
The inspector should work only for you. Ask whether the company also works for the developer of your project, for its contractor or for the broker who sold you the home, and whether anyone else pays it a commission.
A developer's own handover team and a broker's free «inspection» can be useful, but they are not an independent snag report. If the inspection is offered free with a sale, ask who wrote the report and who receives it.
Walk away if you see these
- No sample report before you book
- A price that changes after the visit
- No photos or locations in the report
- Re-inspection not mentioned in the quote
- A promise that the developer «must» fix every item
- No trade licence shown on request
Snagging companies by area
Companies that inspect homes in communities with new handovers, and in the other emirates.
After the inspection
What usually comes next once your home is handed over.
Snagging companies people search for
Companies people in the UAE look up by name. Each gets a page with its licence and services as soon as it is added or claims its page.
Names from UAE search data (Semrush) and from snagging company lists on property portals, November 2026. Listing a name does not mean the company has a page yet.
Snagging in Dubai: questions
Short answers for buyers of new homes.
What does snagging mean?
Finding the defects and unfinished details in a new home, called snags, before you accept it from the developer. The result is a snag list or snag report.
When should I book a snagging inspection?
When the developer tells you the home is ready and lets you in, before you sign the handover. A second inspection before 12 months from the handover is also worth booking.
How long does the developer have to fix defects?
Under Dubai Law No. 6 of 2019: one year from the handover of your unit for defective mechanical, electrical, sanitary and sewerage installations, and ten years from the project's completion certificate for the main structure.
Can I do snagging myself?
Yes, with a checklist of the nine groups on this page. A company brings tools such as a moisture meter or thermal camera and writes a report developers are used to receiving.
What is in a snag report?
Each defect with its room, location, a photo and a short description, grouped so the developer can assign the work. Ask for a sample before you book.
Is snag work the developer's job?
Yes. Snag work means fixing the items on the list, done by the developer or its contractor. The inspector checks it at the re-inspection.
What if the developer refuses to fix the snags?
Keep the report and your written requests. Agreements that contradict the developer's liability under Law No. 6 of 2019 are void, and if the unit is unfit for use because of material constructional defects, the buyer may apply to the competent court to end the contract.
Is there a RERA-approved list of snagging companies?
We found no official register or approval for snagging companies. On Emirae, our editors check each company's trade licence.
Do I need snagging for a resale home?
It is not required, but a pre-purchase inspection shows what needs repair before you agree the price.
Is there a snag list form or template?
Use the checklist on this page: nine groups, 36 checks. For each snag write the room, the spot and a short description, and add a photo. Companies send their own report format.
What is snag rectification?
The repair of the snags on the list by the developer or its contractor. After rectification, the re-inspection checks each item and marks it closed or still open.
Is property inspection available in Abu Dhabi and other emirates?
Yes. Use the links by emirate above and ask each company where it works.
Guides for this service
All guides →Snagging in Dubai: Snag List, Inspection and Your Rights
Snagging in Dubai: what a snag is, how a snag list and inspection work at handover, the 1-year and 10-year developer liability and 5% escrow retention.