Fit-out companies in Dubai
Interior fit-out and renovation companies for apartments, villas, offices and shops: design and build, in-house joinery, the permits they handle, the areas they cover and the licence we checked. With the approvals your fit-out needs.
Fit-out companies in Dubai design and build interiors: kitchens, wardrobes and bathrooms in homes, and complete offices, shops and restaurants from shell and core. Some are fit-out contractors who build from your designer's drawings, others offer design and build with their own joinery workshops, and renovation companies specialise in refreshing villas and apartments.
This page lists interior fit-out companies with the spaces they work on, the services and approvals they handle, prices as each company states them, the areas covered and the licence our editors checked. Below the list: what fit-out includes for homes and offices, which authority approves your works, when a permit may not be needed and how a fit-out project runs.
Where is the space?
An apartment I own
Building management first. Ask your community or building management for its rules and approval before any work.
An office in a DDA area
DDA fit-out permit. The contractor applies: AED 0.90 per sq ft, from AED 200 to AED 10,000, 2 working days, valid 6 months.
A shop or office elsewhere
Dubai Municipality, over 100 sq m. Decoration works in a business unit over 100 sq m need a permit through a Municipality-approved contractor.
In a Trakhees area
Trakhees modification permit. Required before modification or fit-out works in completed buildings in its area.
No company matches these filters.
Showing 1-10 of 10 companies
Compare fit-out companies
What each company states about its services, approvals and terms. Compare quotes on the same drawings and scope.
Prices as each company states them on its own page; the date it last changed them is on the page. Ask for the same in a written quote.
Apartment and villa fit-out and renovation
Fit-out means turning a space into a finished, usable one: in a new home, adding kitchens, wardrobes, lighting and finishes beyond what the developer delivered; in an older one, renovation of bathrooms, kitchens and floors. Villa renovation companies in Dubai also handle extensions, pools and landscaping. Ask which approvals these need before you sign.
- Kitchens and built-in wardrobes
- Bathrooms and waterproofing
- Flooring, ceilings and lighting
- Custom joinery and doors
- Painting and finishes
- Smart home and audio
Commercial and office fit-out
Commercial fit-out takes a unit from shell and core, or from a previous tenant's layout, to a ready office, shop or restaurant. It starts with the landlord's approval and, where required, a permit from the authority of the area, and ends with inspections before you can open.
- Space planning and design
- Partitions, ceilings and floors
- Air conditioning, electrical and plumbing
- Fire alarm and sprinklers
- Data cabling and IT rooms
- Kitchens for restaurants
Snag it before the fit-out
Under Dubai Law No. 6 of 2019, the developer repairs defective installations for one year from the handover of your unit. Book a snagging inspection before you change kitchens, bathrooms or wiring, so that the developer's defects and your contractor's work are not mixed up.
Fit-out permits in Dubai: who approves your works
The authority depends on where the building is. Ask the landlord or building management which one applies before you sign with a contractor.
| Authority | What it requires | Fee and time |
|---|---|---|
| Dubai Development Authority (DDA) | A fit-out permit applied for by the contractor: contractor appointment letter by the tenant, Ejari, NOC from the building owner, NOCs from other authorities, drawings. A Civil Defence completion certificate is needed before the fit-out completion certificate. | AED 0.90 per sq ft, min AED 200, max AED 10,000, + AED 10 + AED 10; 2 working days; valid 6 months |
| Dubai Municipality | A permit for decoration works in a commercial, professional, industrial or office unit over 100 sq m, applied for by a Municipality-approved contractor through the Dubai Building Permit System, with the owner's written consent and Civil Defence conditions. | Not published in the resolution we read |
| Trakhees (PCFC) | A modification permit before any modification or fit-out works in completed buildings in its area. The permit is revalidated if works do not start within 6 months. | «As per project specification» |
| Building owner or management | A no-objection certificate (NOC). Required in the texts of both DDA and Dubai Municipality. | Set by the building |
Dubai Development Authority fit-out permit page, Dubai Municipality Administrative Resolution No. 85 of 2019 and the Trakhees modification permit procedure (revision of September 2024), read 18 November 2026.
When you may not need a fit-out permit
Not every job needs an authority permit. The rules differ by authority, and some come from circulars that may have been updated, so confirm with the landlord and the authority before work starts.
In an apartment, ask the building management for its rules first: working hours, deposits and the works that need its approval.
Who approves what- 01Dubai Municipality: units up to 100 sq m
Decoration works in a commercial unit up to 100 sq m, or inside a trade centre, need no permit, but still a Municipality-approved contractor, Civil Defence conditions and the owner's consent.
- 02The resolution is about business units
Administrative Resolution No. 85 of 2019 covers units licensed for commercial, professional, industrial or office use, not homes.
- 03DDA circulars of 2019
Circular 318 listed minor works without a DDA fit-out permit, such as internal painting, furniture and flooring, and Circular 338 exempted leasable units up to 100 sq m and units in malls under conditions. Ask DDA whether they still apply.
- 04Structure, use and area always need more
Adding structural elements, changing the use or adding floor area goes to a building modification permit with DDA, even where a fit-out permit is not needed.
How a fit-out project runs
A typical order for an office or shop. For an apartment or villa, ask the building management and the authority of your area which approvals your works need.
- 1Brief and design
Layout, materials and budget. Design-and-build companies do both; others work from your designer's drawings.
- 2NOC from the landlord
The building owner or management approves the drawings and sets its rules for the works.
- 3Authority permit
The contractor applies to DDA, Dubai Municipality or Trakhees, depending on the area.
- 4Works and inspections
Partitions, ceilings, services, finishes, then the inspections the permit sets.
- 5Completion
Civil Defence completion, the fit-out completion certificate where required, and handover with a snag list.
How to choose a fit-out company in Dubai
Seven checks before you sign a fit-out contract.
Compare companies- 1See finished work like yours
An office, a villa or a restaurant are different jobs. Ask for photos and addresses of finished projects of your type and size.
- 2Compare quotes on the same scope
Give every company the same drawings and list of works. A cheaper quote may leave things out; ask for a bill of quantities.
- 3Ask who handles the permits
The contractor applies for the DDA fit-out permit, and Dubai Municipality permits go through an approved contractor. Ask which approvals the company has handled before.
- 4Check who makes the joinery
Kitchens, wardrobes and doors made in the company's own workshop are easier to adjust and fix later. Ask where they are made.
- 5Fix the dates and the payments
Stages of payment tied to finished work, a finish date and what happens if it slips.
- 6Ask for the defects period
How long the company will come back to fix defects after handover, and what it covers. Put it in the contract.
- 7Check the licence and reviews
On Emirae every company has its licence checked by an editor, and reviews come only from people with a confirmed email.
How much does fit-out cost in Dubai?
There is no official price for fit-out: companies quote per project, per square foot or per item, and the range is wide because materials and scope differ. On Emirae, companies show their prices as they state them; when a price is not shown, ask for a written quote on your drawings.
Add the official costs to your budget: for a DDA area, the fit-out permit at AED 0.90 per sq ft, between AED 200 and AED 10,000, plus AED 10 and AED 10, and any deposits your building asks for.
One price for the whole scope, based on drawings and a bill of quantities.
A rate for a defined finish level. Check exactly what the rate includes.
Kitchens, wardrobes or doors priced one by one.
- Is the permit fee in the price?
- What is the defects period after handover?
- Are design changes during the works charged?
- Is VAT included?
What a fit-out contract should say
- Drawings and a bill of quantities
- Who applies for which permits
- Payment stages tied to finished work
- Start date, finish date and delay terms
- Who pays the building's deposits
- The defects period after handover
Be careful if you see these
- A large payment before any work
- «No permit needed» without asking where
- A quote with no quantities
- No trade licence shown on request
- Joinery from a supplier they cannot name
- No written finish date
Fit-out companies by area and emirate
Companies that work in each part of Dubai, and fit-out companies in the other emirates.
Before and after the fit-out
Services people book together with a fit-out.
Fit-out companies people search for
Companies people in the UAE look up by name. Each gets a page with its licence and services as soon as it is added or claims its page.
Names from UAE search data (Semrush, November 2026). Listing a name does not mean the company has a page yet.
Fit-out in Dubai: questions
Short answers for owners, tenants and companies.
Fit-out meaning: what does fit-out include?
Making a space ready to use: partitions, ceilings, floors, lighting, services, joinery and finishes. Fit-out works can start from an empty shell or from a previous layout.
Do I need a permit for fit-out in Dubai?
It depends on the authority of the area and the works. In DDA areas the contractor applies for a fit-out permit; Dubai Municipality requires a permit for decoration works in business units over 100 sq m; Trakhees requires a modification permit in completed buildings in its area. The building owner's NOC is needed too.
How much is a DDA fit-out permit?
AED 0.90 per sq ft, at least AED 200 and at most AED 10,000, plus AED 10 and AED 10. It takes 2 working days and is valid for 6 months.
What documents does DDA ask for?
A contractor appointment letter from the tenant, the Ejari, a NOC from the building owner, NOCs from other authorities, and the approved and proposed drawings.
Who applies for the permit, me or the contractor?
For DDA and Dubai Municipality, the contractor applies; for Dubai Municipality it must be a Municipality-approved contractor.
What is the difference between fit-out and renovation?
Fit-out finishes a space for use; renovation renews an existing home or office. Some companies do both.
What is joinery fit-out?
Custom woodwork: kitchens, wardrobes, doors, wall panels and reception desks, made in a workshop and installed on site.
How long does an office fit-out take?
It depends on the size and scope, and on the permit and inspections. Ask each company for a written programme with dates.
Is there a warranty on fit-out works?
Ask the company for its defects period after handover and put it in the contract. A developer's legal liability for a new building is a different matter.
Are there fit-out companies in Abu Dhabi and Sharjah?
Yes. Use the links by emirate above, and check which authority approves works there.
Guides for this service
All guides →Interior Design Companies in Dubai: How to Choose
Interior design companies in Dubai: designer vs design-and-build, villa and apartment projects, permits and building NOCs, the brief, fees, contracts and red flags.
Construction Companies in Dubai: Law 7 of 2025 and Checks
Construction companies in Dubai: Law No. 7 of 2025, Municipality classification and registry, villa permits through consultants, building rules and checks.